Modifications and Modernizations

WSP has made itself a name when it comes to modifications, upgrades or complete replacement of strip floatation furnaces

If you can answer one of the following questions with "YES", please contact us:

  • Is the throughput of your floatation furnace not satisfying?
  • Is the stability of the strip run or the annealing result (e.g. planity) not satisfying?
  • Is the condition of the furnace zone (usually the inner components) critical so that problems result?

In these cases, WSP can help you! We check your plant and show you improvement opportunities. From minor repairs, exchange of damaged internal parts up to the exchange of the complete plant, we have everything already done. We always make sure that the rebuilding time is as short as possible.

 

Continous improvement!

The modern WSP Strip Floatation Furnaces are extremely robust and durable. In particular, we have optimized:
  • Massive design of nozzle systems, typically 3 mm sheet thickness
  • Massive design: reinforcements at many components
  • Massive design: improved geometries, less flat surfaces
  • Material selection for the individual parts according to temperature and mechanical stress
  • Maintainability: all WSP Strip Floatation Furnaces are easily accessible and maintainable (e.g. approx. 600 mm passage width in a 650-furnace).

Generally, in addition to the improved durability, we can also enhance the efficiency of your plant. Of course also our nozzle system has become more powerful und offers an improved strip stability.

 

Project schedule: example of a furnace exchange with a German customer

A complete strip floatation furnace including cooling zones was replaced during this project. The complete control system was renewed at the same time.Bilder aus dem Projekt: Vergleich alt - neu - WSP Düsensystem

 

Date Description
by 15 December Set-up of new switching cabinets, preparation of wiring and mechanical piping
16 December Last production day of the old plant
16 to 19 December Deconstruction and removal of the old system
19 December Set-up and alignment of new plant
20 December to 3 January Mechanical and electrical installation and commissioning
4 January Start of production, 1-shift
7 January Standard production, 3-shift

 

Old furnace New WSP Furnace

WSP Engineering

... since 1989

WSP GmbH was founded in 1989 by Prof. Dr.-Ing. Carl Kramer. At first, as an engineering office, later our spectrum has been enlarged  ...Read more...

Laboratory Heat Treatment Plant at ITP

Institut für Termorpozesstechnik - ITP - Labor Wärmebehandlungsanlage

... for your material development

 ITP - Institut für Thermopozesstechnik has developed and built a heat treatment plant to anneal samples with the real temperature and speed of an annealing line. This may accelerate your material development ... Read more...

WSP - German Quality

WSP - Made in Germany

Contact - WSP

Our address:
An der Glashütte 10
52074 Aachen, Germany
phone +49 241-879703-0
This email address is being protected from spambots. You need JavaScript enabled to view it.
Office hours:
Monday-Friday 08:00 a.m. - 05:00 p.m.



Our Customers

About this website

This website uses Google Analytics, a web analytics service provided by Google Inc. („Google“). Google Analytics uses so-called „Cookies“, text files that are stored on your computer, helping to analyze, how users use the website. You may refuse the use of cookies by selecting the appropriate settings in your brwoser software; however, we point out that in this case it maybe will not be possible to use all functions of this website fullly. Furthermore, you can prevent the collection and circulation of data generated by the cookie as well as data concerning your use of the website (including your IP address) by loading and installing the following plug-in: Google Browser Plugin .

Language